/**/ ?>
Skip to contentFor an optimal viewing experience, it is recommended to view this website on the latest versions of IE, Firefox, Chrome or Safari.
The Peak Tower Revitalisation Project included demolition, A&A works, construction, fitting out and maintenance of the existing superstructure of The Peak Tower comprising the lower five floors "Podium" (Level 0 to Level 4), Podium Deck (Level 5), the upper three floors " Bowl" (Undercroft to Level 6 and Level 7), Roof Deck (Level 8) and external facade. The tower remained open during construction, presenting a number of logistical challenges.