The Temporary Quarantine Facilities at Penny’s Bay (Phase 3A) are located at Lantau Island. The Design and Construction project widely adopted Modular Integrated Construction (MiC) for 97% of the construction areas, which was combined with the innovative process of Design for Manufacture and Assembly (DfMA). A a total of 901 MiC modules were fabricated to provide 857 quarantine units plus ancillary facilities. The project was completed within a very short time frame of 89 days, to support the efforts to fight the pandemic.